I've been looking forward to today since May. Why? Because today was the start of my master bathroom remodel. When we bought this house we knew right away the bathroom had to be changed. The vanity was too small and so was the shower. The shower was a tiny corner shower so small we could not shower without hitting our elbows on the door, which was not installed properly either. I found a contractor and ordered everything needed for the bathroom and began the long wait. It took two months for everything to get shipped here. Once it all arrived, I had tons of boxes filling my garage and was left parking outside. Then my contractor broke his finger and the job was pushed back again.
Finally, the day arrived. The contractor showed up and started tearing everything out. Then he went out to the garage, only to discover everything was there but the vanity top! WHAT?! Apparently the plumbing supply company I ordered from left it off the order. And to top it off, all my stuff is custom order solid surface material, so it's not like I can just run up there and get one. Luckily, the company has one in my material, size and color in Canada but it will take at least two weeks to get here. Meanwhile, my old vanity top broke in half while being removed, so I can't even use it as a temporary one. Looks like I'll be without a finished master bath for at least the next month. Great!
No comments:
Post a Comment